Project · Tottenville, Staten Island, New York
Living Breakwaters
Off Tottenville, Staten Island, eight new breakwaters do something unusual for a coastal-defense project: their surfaces were designed as carefully for marine life as for waves. Completed in 2024, Living Breakwaters pairs 2,400 linear feet of offshore infrastructure with habitat features and a community education effort. SCAPE developed the design vision with New York State and a large team of engineering and ecological partners.

New York State completed the eight offshore breakwaters in 2024 at a reported total project cost of $111 million. Together the partially submerged structures span 2,400 linear feet off Tottenville, Staten Island.
The armor stone and specially shaped concrete are intended to reduce wave energy and shoreline erosion while providing habitat for marine life. SCAPE led a team of landscape architects, engineers and ecologists in developing the design.
The project reduces some coastal hazards, but it does not make the surrounding community immune to flooding. Habitat conditions and shoreline change require monitoring over time to establish how the work performs.
Key facts
- 2,400 linear feet of offshore breakwaters.
- Construction completed in 2024; state-reported project investment of $111 million.
- Located off Tottenville on Staten Island’s South Shore.
- Designed to reduce wave energy and beach erosion while supporting marine habitat.
- SCAPE led the landscape architecture and design vision; delivered with New York State and multiple partners.
Further reading
Related on BUILDPLACES
- Kate Orff (Explore)
- Tom Lee Park (Explore)
- What Is a Living Shoreline? (Explainer)
- How Does Land Reclamation Work? (Explainer)
- What Is a Levee? (Explainer)
More images